Our Projects

Project 1

  1. Original roof was removed due to severe damage
  2. A “Tear Off” was done in a single day, as well as a change of wood panels.
  3. Vent pipes were installed, along with new Flashings, and drip edges. All vent pipes were painted to match shingles styles. 
X